MY EV , 85 electric fiero

MY EV , 85 electric fiero
A conversion of a gas engine powered car to 100% plug in electric.

Saturday, August 9, 2008

The PRICE $ 9683.45 So Far...


Running Price of the conversion.

Curtis 144V DC Controller, 500A $1,448.88 USD
WarP 9 DC motor $1,700.00 USD
IOTA 96VDC - 190VDC 55A DC/DC Converter Kit $188.88 USD
Brake Booster Vacuum Pump Kit, 12VDC $358.88 USD
PakTrakr 800EV Display w/ 1 Remote $159.95 USD
PakTrakr 8-Battery Remote x2 $159.90 USD
PakTrakr 600A Current Sensor $49.95 USD
CEV Heater: 108 - 144V 1500W with Housing $88.88 USD
Curtis PB6 Throttle Potbox $98.99 USD
GM Adapter Kit for V6 (2.8L) and 4 Cyl. (2.2L) to 9 $898.99 USD
Tyco Kilovac 500A 320V LEV200 Contactor, 12V x2 $179.98 USD

Now I don't care what all this adds up to because there is shipping and handling. All the stuff Above was:

$ 5,637.36 so far!


Part # Qty Description Unit Price Discnt Total
88169 2 84-86 HEADLIGHT MOTOR REBUILD KIT $7.95 ~ 15.9
69674 2 84-86 PLASTIC HEADLAMP GEAR $14.95 ~ 29.9
62620 1 84-86 HEADLAMP RELAY $32.95 ~ 32.95
Sub Total: $78.75
Tax: $0.00
(US PRIORITY MAIL (US - 3-4 DAYS) ) Shipping: $5.34
Total charged to Visa **** **** **** xxxx: $84.09

new current total $5721.45$ and still growing
Angle Iron 20ft 1.25x1/8 $42.70
Napa auto parts: $48.54
cv boot.rear pads, brake tool
New total: 5812.69$

60ft of 2/0 cable $201.76

New grand total:$$$ 6014.45

Something I left out for a bit until I sold the engine:
Car purchase price 600.00$
Selling the Gas engine -300.00$
New grand total :$$$ 6314.45 $$$

Zivan Charger w/shipping 1049.00 $

8-7-08 total = $$$ 7363.45 $$$

spring spacers and throtle return spring 39.47 $
2/0 terminal ends 50 3/8 and 10 1/2 72.65 $
motor mount and pilot bushing 7.88$

new grand total $$$ 7483.45 $$$

BATTERIES 2200$

9683.45

No comments: